系統集成項目管理工程師每日一練試題內容(2019/7/4)
試題1: The ( ) process analyzes the effect of risk events and assigns a numerical rating to those risks.
A.Risk Identification
B.Quantitative Risk Analysis
C.Qualitative Risk Analysis
D.Risk Monitoring and Control
因承建單位違反合同導致工程竣工時間延遲,監(jiān)理單位(1)。關于信息工程實施合同中關于工期的敘述,不正確的是(2)
(1)A. 不承擔責任
B. 承擔全部責任
C. 與承建單位共同承擔責任
D. 承擔連帶責任
(2)A. 在合同協議書內應明確注明開工日期
B. 在合同協議書內應明確注明竣工日期
C. 在合同協議書內應明確注明合同工期總日歷天數
D. 通過招標選擇承包人的項目,其合同工期天數就是招標文件要求的工期天數
The (1) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several (2).
(1)A. waterfall model
B. workflow reference model
C. evolutionary model
D. spiral model
(2)A. workflow engines
B. processes
C. workflow threads
D. tasks
評標委員會中,技術、經濟等方面的專家不得少于成員總數的( )。
A、2/3 B、1/2 C、1/3 D、2/5
軟件需求規(guī)格說明書在軟件開發(fā)中具有重要作用,但其不應作為()
A、軟件設計的依據
B、生命周期估算的依據
C、軟件驗收的依據
D、數據庫設計的依據
在某操作系統中,47%的錯誤是由該系統4%的程序模塊產生的,該現象屬于()特征
A、蒙特卡洛
B、大數定律
C、帕累托定律
D、PDPC
用德爾菲方法估算一個活動的成本,三個回合后的結果如下表所示(數值表示活動時間),如果每小時的成本是40美元。那么可能的成本應該是()美元
A、880
B、800
C、100
D、900
溫馨提示:因考試政策、內容不斷變化與調整,信管網網站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網軟考課程由信管網依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |